Construction Update
Posted 06/25/2012 11:30AM

Monday: Medium trucking. Building A-Misc. stage wiring; assembly space fabric wrapped panels; exterior door hardware and thresholds. Building B: Casework install; reading room ceiling tile. Building C-Elevator install; casework; flooring fabric wrapped panels. Building D1-Chapel ceiling support system, fire sprinkler install; chapel doors; ceiling tile. Building D2-Elevator install; wall trim; fabric wrapped panels. Site work-Building C courtyard concrete pour; site irrigation, soil amendment and planting; sand blasting; D2 paver section; rain harvest/grey water system tie in; Building 100/200 safe-off.

Tuesday: Light trucking. Building A-Misc. stage wiring; assembly space fabric wrapped panels; exterior door hardware and thresholds. Building B: Casework install; reading room ceiling tile. Building C-Elevator install; casework; flooring; fabric wrapped panels. Building D1-Chapel ceiling support system, fire sprinkler install; chapel doors; ceiling tile. Building D2-Elevator install; wall trim; fabric wrapped panels. Site work-Site irrigation, soil amendment and planting; sand blasting; saw cutting; D2 paver section; rain harvest/grey water system tie in; Building 100/200 safe-off.

Wednesday: Medium trucking. Building A-Misc. stage wiring; assembly space fabric wrapped panels; exterior door hardware and thresholds. Building B: Casework install; carpet tile. Building C-Elevator install; casework; flooring. Building D1-9 Wood ceiling panels; flooring. Building D2-Elevator install; wall trim; fabric wrapped panels. Site work-Site irrigation, soil amendment and planting; sand blasting; saw cutting; grading and rock for D1/A walk ways; D2 paver section; rain harvest/grey water system tie in; Portable deck demo.

Thursday:   Light trucking. Building A-Misc. stage wiring; assembly space fabric wrapped panels; Band room OFCI casework; Tectum panel install. Building B: Casework install; carpet tile. Building C-Elevator install; casework; flooring. Building D1-9 Wood ceiling panels; flooring. Building D2-Elevator install; wall trim; fabric wrapped panels. Site work-Site irrigation, soil amendment and planting; sand blasting; saw cutting; grading and rock for D1/A walk ways; D2 paver section; portable deck demo.

Friday : Light trucking. Building A-Misc. stage wiring; assembly space fabric wrapped panels; Band room OFCI casework; Tectum panel install. Building B: Casework install; carpet tile. Building C-Elevator install; casework; flooring. Building D1-9 Wood ceiling panels; flooring. Building D2-Elevator install; wall trim; fabric wrapped panels. Site work-Site irrigation, soil amendment and planting; sand blasting; saw cutting; grading and rock for D1/A walk ways; D2 paver section.

PORTABLE CLASSROOMS TO BE REMOVED AND ABATEMENT OF BUIDLINGS 100, 200 OVER THE NEXT TWO WEEKS.